Organization Configuration
The
section allows you to configure your current organization.Option | Description | Default |
---|---|---|
Enable staging contents |
For clients in this organization, allow content staging by default. |
Unchecked |
Enable Errata E-mail Notifications |
For users in this organization, send email notifications when errata (patches) are available. |
Checked |
Enable Software Crash Reporting |
In case of a crash, a log of the crash is saved to file. |
Checked |
Enable Upload of Crash Files |
Allow crash log files to be uploaded to SUSE. |
Checked |
Crash File Upload Size Limit |
The maximum crash log file size (in MB) that can be uploaded to SUSE. |
2048 MB |
Enable Upload of Detailed SCAP Files |
Allow detailed SCAP content files to be uploaded for auditing. |
Unchecked |
SCAP File Upload Size Limit |
The maximum SCAP file size (in MB) that can be uploaded. |
2048 MB |
Allow Deletion of SCAP Results |
Allow SCAP results to be deleted after the audit is complete. |
Checked |
Allow Deletion After |
The number of days after an SCAP audit is complete, that results can be deleted. |
90 days |
Synchronize patches on Content Lifecycle Management build |
Controls whether the patch attributes and affected packages should be synchronized to cloned patches when building a content Project |
Checked |
-
For more information about content staging, see administration:content-staging.adoc.
-
For more information about OpenSCAP, see administration:openscap.adoc.
-
For more information about organizations, see administration:organizations.adoc.
-
For more information about Content Lifecycle Management, see administration:content-lifecycle.adoc.